• 0

Project Consultancy, Reports & Profiles


We can provide you detailed project reports on the following topics. Please select the projects of your interests.

Each detailed project reports cover all the aspects of business, from analysing the market, confirming availability of various necessities such as plant & machinery, raw materials to forecasting the financial requirements. The scope of the report includes assessing market potential, negotiating with collaborators, investment decision making, corporate diversification planning etc. in a very planned manner by formulating detailed manufacturing techniques and forecasting financial aspects by estimating the ost of raw material, formulating the cash flow statement, projecting the balance sheet etc.

We also offer self-contained Pre-Investment and Pre-Feasibility Studies, Market Surveys and Studies, Preparation of Techno-Economic Feasibility Reports, Identification and Selection of Plant and Machinery, Manufacturing Process and or Equipment required, General Guidance, Technical and Commercial Counseling for setting up new industrial projects on the following topics. Many of the engineers, project consultant & industrial consultancy firms in India and worldwide use our project reports as one of the input in doing their analysis.

Sort by :
Be a Donkey Breeder Start Your Own Donkey Farm And Make More Money Than You Could Imagine
Be a Donkey Breeder Start Your Own Donkey Farm And Make More Money Than You Could Imagine

 

Introduction:

"Donkey milk farming" is the practice ... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Wire Nails
Manufacturing Business Of Wire Nails

Wire nails are a type of fastener typically used... Read More

Capacity :
Wire Nails: 48,000 MT Per Annum
Plant and Machinery cost:
1800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
65.00 %
TCI :
0.00 Lakhs
Cost of Project :
2600.00Lakhs
Add To Inquiry Basket
A Business Plan for Aluminium Ingots from Aluminium Scrap
A Business Plan for Aluminium Ingots from Aluminium Scrap

Aluminium ingots from aluminium scrap are metal ... Read More

Capacity :
Aluminium Alloy Ingots: 6,000 MT per Annum Aluminium Scrap: 99 MT per Annum
Plant and Machinery cost:
500.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
1100.00Lakhs
Add To Inquiry Basket
Start Production of Cold Pressed Rice Bran Oil (Edible Oil)
Start Production of Cold Pressed Rice Bran Oil (Edible Oil)

Cold Pressed R... Read More

Capacity :
Cold Pressed Rice Bran Oil (Edible Oil) : 270,000 Ltrs Per Annum
Plant and Machinery cost:
20.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
161.00Lakhs
Add To Inquiry Basket
Setup Plant Of Super Absorbent Polymer
Setup Plant Of Super Absorbent Polymer

Super Absorben... Read More

Capacity :
Super Absorbent Polymer: 30,000 MT Per Annum
Plant and Machinery cost:
2000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
4900.00Lakhs
Add To Inquiry Basket
How to Setup Silicon Carbide Abrasive Nozzle Liners Plant
How to Setup Silicon Carbide Abrasive Nozzle Liners Plant

What Are Silicon Carbide Abrasive Nozzle Liners? Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production of Nicotine USP99+
Start Production of Nicotine USP99+

Nicotine USP99+ is a form of highly concentrated nicotine produced... Read More

Capacity :
-
Plant and Machinery cost:
156.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
436.00Lakhs
Add To Inquiry Basket
Start-up Production of MS Barrels (Metal Barrels) Used in Oil Packaging
Start-up Production of MS Barrels (Metal Barrels) Used in Oil Packaging

MS Barrels, also known as Metal Barrels, are specially designed containers used for p... Read More

Capacity :
MS Barrels (Metal Barrels): 210,000 Units Per Annum, MS Scrap: 300 Units Per Annum
Plant and Machinery cost:
148.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
484.00Lakhs
Add To Inquiry Basket
Start Industry Of Potato Starch
Start Industry Of Potato Starch

Potato starch ... Read More

Capacity :
Potato Starch 30 MT Per Day
Plant and Machinery cost:
329.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
894.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of NC Thinner
Manufacturing Business Of NC Thinner

Nitrocellulose thinning is a process where nitrocellulose (NC) is used to reduce the ... Read More

Capacity :
-
Plant and Machinery cost:
36.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
150.00Lakhs
Add To Inquiry Basket
Setup Own Business of Latex Mattress
Setup Own Business of Latex Mattress

 

Product:<... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
How to Start Your Own Glass Fiber Reinforced Polymer (GFRP) Rebar Business
How to Start Your Own Glass Fiber Reinforced Polymer (GFRP) Rebar Business

Product: Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan for Sodium Chlorite (NaClO2) Direct Electrolysis Process from Sodium Chloride to Sodium Chlorite
A Business Plan for Sodium Chlorite (NaClO2) Direct Electrolysis Process from Sodium Chloride to Sodium Chlorite

Sodium chlorite is a chemical compound with the formula NaClO2. It is a white crystalline solid, odourles... Read More

Capacity :
Sodium Chlorite (NaClO2) 15 MT Per Day
Plant and Machinery cost:
567.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
48.00 %
TCI :
0.00 Lakhs
Cost of Project :
1892.00Lakhs
Add To Inquiry Basket
A Business Plan for Highway Guard Crash Barrier with Metal Beam  (Roll Forming) And Galvanizing Plant
A Business Plan for Highway Guard Crash Barrier with Metal Beam (Roll Forming) And Galvanizing Plant

Metal beam crash barriers, also known as guardrails, are an important safety feature on highways, bridges... Read More

Capacity :
Metal Beam Highway Crash Barrier 167 MT per day MS Sheet Scrap 33 MT per day
Plant and Machinery cost:
701.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
2608.00Lakhs
Add To Inquiry Basket
A Business Plan for Soda Ash By Solvay Process (without using limestone)
A Business Plan for Soda Ash By Solvay Process (without using limestone)

 

Soda ash, also known as sodium carbonate, is an essential chemical used in various industrial a... Read More

Capacity :
Soda Ash (Na2CO3) 200,000 MT Per Annum Ammonium Chloride (NH4Cl) 200,000 MT Per Annum
Plant and Machinery cost:
132500.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
13.00%
Break Even Point (BEP):
36.00 %
TCI :
0.00 Lakhs
Cost of Project :
146900.00Lakhs
Add To Inquiry Basket
Engineered Building Steel Structure Manufacturing Business
Engineered Building Steel Structure Manufacturing Business

Pre-Engineered Building (PEB) Steel Structures are a type of building system used for... Read More

Capacity :
PEB Structure 40 MT Per Day Steel Scrap waste Product 2 MT Per Day
Plant and Machinery cost:
462.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
28.00 %
TCI :
0.00 Lakhs
Cost of Project :
5600.00Lakhs
Add To Inquiry Basket
Start Lithium Oxide From Lithium Ore Manufacturing Plant
Start Lithium Oxide From Lithium Ore Manufacturing Plant

Lithium oxide, also known as lithia, is a chemical compound c... Read More

Capacity :
Lithium Oxide 4 MT Per Day
Plant and Machinery cost:
578.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
2808.00Lakhs
Add To Inquiry Basket
Start Maize Starch & Liquid Glucose Production Plant
Start Maize Starch & Liquid Glucose Production Plant

 

Maize starch is a white powder that is derived from the endosperm of the ma... Read More

Capacity :
-
Plant and Machinery cost:
3000.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
24.00%
Break Even Point (BEP):
44.00 %
TCI :
0.00 Lakhs
Cost of Project :
4300.00Lakhs
Add To Inquiry Basket
Start Production Of Nickel From Nickel Ore
Start Production Of Nickel From Nickel Ore

Nickel is an essential elem... Read More

Capacity :
Nickel Cathod 4 MT Per Day
Plant and Machinery cost:
638.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
3030.00Lakhs
Add To Inquiry Basket
Manufacturing Business Of Biodegradable Boxes From Rice Straw and Rice Husk
Manufacturing Business Of Biodegradable Boxes From Rice Straw and Rice Husk

In place of conventional pa... Read More

Capacity :
Biodegradable Boxes wt. 30 gms 15,160,000 Nos Per Annum
Plant and Machinery cost:
39.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
280.00Lakhs
Add To Inquiry Basket
A Business Plan for Epoxy Resin
A Business Plan for Epoxy Resin

Epoxy resin is a form of thermosetting polymer that is widely utilized in many indust... Read More

Capacity :
Epoxy Resin Liquid 100 MT Per Day
Plant and Machinery cost:
1800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
4300.00Lakhs
Add To Inquiry Basket
A Business Plan For Polyurethane Prepolymer
A Business Plan For Polyurethane Prepolymer

The versatile substance known as polyurethane prepolymer, or PUP, is utilized in a va... Read More

Capacity :
Polyurethane Prepolymer (HMDI Series) 50,000 MT Per Annum
Plant and Machinery cost:
2336.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
49.00 %
TCI :
0.00 Lakhs
Cost of Project :
4866.00Lakhs
Add To Inquiry Basket
Start Industry of Activated Carbon from Coconut Shell
Start Industry of Activated Carbon from Coconut Shell

An organic form of activate... Read More

Capacity :
Activated Carbon 5 MT per day
Plant and Machinery cost:
316.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
743.00Lakhs
Add To Inquiry Basket
Setup Unit Of Tea Blending and Packaging (Tea, Green Tea & Herbal Tea)
Setup Unit Of Tea Blending and Packaging (Tea, Green Tea & Herbal Tea)

In order to make a distinctive and delectable blend, different teas, including ... Read More

Capacity :
-
Plant and Machinery cost:
41.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
56.00 %
TCI :
0.00 Lakhs
Cost of Project :
242.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of Blood Bags
Start Manufacturing Business Of Blood Bags

Blood bags are containers designed to store and transport blood and other related pro... Read More

Capacity :
Blood Bags 10,000 Nos per day
Plant and Machinery cost:
291.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
75.00 %
TCI :
0.00 Lakhs
Cost of Project :
1092.00Lakhs
Add To Inquiry Basket
Start Production of Decorative Laminated Sheet (Sunmica)
Start Production of Decorative Laminated Sheet (Sunmica)

Decorative laminated sheet is a versatile material used in the manufacturing of various produ... Read More

Capacity :
Decorative Laminated Sheet (Sunmica) 5,000,000 Sq.Mt. Per Annum
Plant and Machinery cost:
1130.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
63.00%
Break Even Point (BEP):
34.00 %
TCI :
0.00 Lakhs
Cost of Project :
2257.00Lakhs
Add To Inquiry Basket
Copper Tube Fittings Manufacturing Business
Copper Tube Fittings Manufacturing Business

Copper Tube Fittings (Elbows 45 Deg., 90 Deg., Long Radius Elbows, Couplings,... Read More

Capacity :
Copper Tube Fittings 600 MT Per Annum Copper Scrap 24 MT Per Annum
Plant and Machinery cost:
214.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
54.00 %
TCI :
0.00 Lakhs
Cost of Project :
675.00Lakhs
Add To Inquiry Basket
Setup Pharmaceutical Tablets Unit (API Metformin, Amoxicillin, Ibuprofen, Paracetamol) Manufacturing Plant
Setup Pharmaceutical Tablets Unit (API Metformin, Amoxicillin, Ibuprofen, Paracetamol) Manufacturing Plant

Pharmaceutical tablets are one of the most commonly used dosage forms in medicine. Th... Read More

Capacity :
-
Plant and Machinery cost:
163.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
50.00 %
TCI :
0.00 Lakhs
Cost of Project :
786.00Lakhs
Add To Inquiry Basket
Start Industry with Serum, Cream and Shampoo
Start Industry with Serum, Cream and Shampoo

Why The Beauty Industry Is... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
A Business Plan For Bottling of Refined Oil •	Refined Sunflower Oil • Refined Corn Oil • RBD Palm Olein Oil • Extra Virgin Olive Oil
A Business Plan For Bottling of Refined Oil • Refined Sunflower Oil • Refined Corn Oil • RBD Palm Olein Oil • Extra Virgin Olive Oil

Bottling of refined oil refers to the process of packaging high-quality, processed oi... Read More

Capacity :
-
Plant and Machinery cost:
402.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
58.00 %
TCI :
0.00 Lakhs
Cost of Project :
1975.00Lakhs
Add To Inquiry Basket
Start Production Of Graphite From Graphite Deposits
Start Production Of Graphite From Graphite Deposits

Graphite is a mineral that ... Read More

Capacity :
Graphite Powder 10 MT Per Day
Plant and Machinery cost:
513.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
51.00 %
TCI :
0.00 Lakhs
Cost of Project :
1998.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of Cement Paper Bags with Printing Unit
Start Manufacturing Business Of Cement Paper Bags with Printing Unit

 

Cement Paper Bags with Printing are a popular ... Read More

Capacity :
Cement Paper Bag 50 Kgs Size 1,250 Th.Nos. Per Day Cement Paper Bag 25 Kgs Size 1,250 Th.Nos. Per
Plant and Machinery cost:
3600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
35.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
22800.00Lakhs
Add To Inquiry Basket
Setup Plant of  Biodegradable Corn Starch Granules, Bags, Plates & Cups
Setup Plant of Biodegradable Corn Starch Granules, Bags, Plates & Cups

Biodegradable corn starch products are a new innovation that ... Read More

Capacity :
-
Plant and Machinery cost:
440.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
1427.00Lakhs
Add To Inquiry Basket
Setup Unit Of Aluminium Extrusion Plant
Setup Unit Of Aluminium Extrusion Plant

 

Aluminium extrusi... Read More

Capacity :
Aluminium Extruded Products 10 MT per day
Plant and Machinery cost:
234.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
901.00Lakhs
Add To Inquiry Basket
Unlocking the Secrets: How to Set Up a Galena Lead Plant Successfully
Unlocking the Secrets: How to Set Up a Galena Lead Plant Successfully

Lead from galena refers to the ex... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Setup Plant of Analytical Testing Lab (Food, Water, Soil and Pharma)
Setup Plant of Analytical Testing Lab (Food, Water, Soil and Pharma)

Analytical testing labs are facilities that specialize in tes... Read More

Capacity :
-
Plant and Machinery cost:
410.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
646.00Lakhs
Add To Inquiry Basket
Invest In Kraft Paper From Pulp  Industry
Invest In Kraft Paper From Pulp Industry

 

Kraft paper, also... Read More

Capacity :
Kraft Paper 20 MT Per Day
Plant and Machinery cost:
2002.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
59.00 %
TCI :
0.00 Lakhs
Cost of Project :
4040.00Lakhs
Add To Inquiry Basket
Start Carton Boxes Manufacturing Business
Start Carton Boxes Manufacturing Business

Carton boxes, also known as corrugated boxes, are commonly used in packaging and ship... Read More

Capacity :
Carton Boxes 40 MT Per Day
Plant and Machinery cost:
409.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
61.00 %
TCI :
0.00 Lakhs
Cost of Project :
2071.00Lakhs
Add To Inquiry Basket
Start Your Own Essential Oil and Oleoresins From Chili, Pepper, Ginger and Turmeric Plant
Start Your Own Essential Oil and Oleoresins From Chili, Pepper, Ginger and Turmeric Plant

 

Essential oils and oleoresins are concentrated... Read More

Capacity :
-
Plant and Machinery cost:
934.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
1479.00Lakhs
Add To Inquiry Basket
Start Manufacturing Business Of Solar PV Glass
Start Manufacturing Business Of Solar PV Glass

Solar PV Glass, also known as photovoltaic gl... Read More

Capacity :
Solar PV (Photovoltaic) Glass 300 MT per Day
Plant and Machinery cost:
2800.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
4150.00Lakhs
Add To Inquiry Basket
Setup Plant of Truck Trailer (Flatbed Trailer & Tip Trailer)
Setup Plant of Truck Trailer (Flatbed Trailer & Tip Trailer)

Are you curious about what exactly a Truck Tr... Read More

Capacity :
Cost Estimation Capacity: Flatbed Trailer 6 Nos per Day Tipper Trailer 6 Nos per Day
Plant and Machinery cost:
313.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
31.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
1172.00Lakhs
Add To Inquiry Basket
Liquid Caustic Soda Industry (From Caustic Flakes)
Liquid Caustic Soda Industry (From Caustic Flakes)

Liquid caustic soda, also known as sodium hydroxide, is a powerful and versatile chem... Read More

Capacity :
Liquid Caustic Soda Lye 48% 80 MT Per Day
Plant and Machinery cost:
305.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
29.00%
Break Even Point (BEP):
63.00 %
TCI :
0.00 Lakhs
Cost of Project :
888.00Lakhs
Add To Inquiry Basket
A Business Plan For Red Oxide Pigment
A Business Plan For Red Oxide Pigment

Red oxide pigment, also kno... Read More

Capacity :
Red Oxide Pigment 200 MT Per Day
Plant and Machinery cost:
5081.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
57.00 %
TCI :
0.00 Lakhs
Cost of Project :
6945.00Lakhs
Add To Inquiry Basket
A Business Plan For Linear Alkyl Benzene
A Business Plan For Linear Alkyl Benzene

Linear Alkyl Benzene (LAB) is a versatile chemical compound that pl... Read More

Capacity :
Linear Alkyl Benzene 20 MT Per Day
Plant and Machinery cost:
340.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
25.00%
Break Even Point (BEP):
68.00 %
TCI :
0.00 Lakhs
Cost of Project :
832.00Lakhs
Add To Inquiry Basket
Invest In Methylaniline Business
Invest In Methylaniline Business

Methylaniline is a clear to... Read More

Capacity :
Methylaniline 40 MT Per Day
Plant and Machinery cost:
730.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
53.00%
Break Even Point (BEP):
47.00 %
TCI :
0.00 Lakhs
Cost of Project :
2056.00Lakhs
Add To Inquiry Basket
Invest In Alloy Wheel Business for Two Wheelers
Invest In Alloy Wheel Business for Two Wheelers

Alloy wheels for two-wheele... Read More

Capacity :
Alloy Wheel for 2 Wheeler 400 Pcs Per Day
Plant and Machinery cost:
157.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
46.00 %
TCI :
0.00 Lakhs
Cost of Project :
802.00Lakhs
Add To Inquiry Basket
Setup Plant of Freon Gases for Refrigeration
Setup Plant of Freon Gases for Refrigeration

 

Freon gases, ofte... Read More

Capacity :
-
Plant and Machinery cost:
1064.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
3229.00Lakhs
Add To Inquiry Basket
Find out you can Start Manufacturing Camphor Powder (Technical Grade)
Find out you can Start Manufacturing Camphor Powder (Technical Grade)

Introduction... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Start Production of Silica from Rice Husk Ash
Start Production of Silica from Rice Husk Ash

In the concrete business, rice husk ash silica is a viable al... Read More

Capacity :
Silica 5.80 MT Per Day Activated Carbon (by product) 0.64 MT Per Day Sodium Carbonate (by product) 0
Plant and Machinery cost:
745.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
45.00 %
TCI :
0.00 Lakhs
Cost of Project :
1121.00Lakhs
Add To Inquiry Basket
Profitable Business of Lithium Ion Battery Pack
Profitable Business of Lithium Ion Battery Pack

In a lithium ion (li-ion) b... Read More

Capacity :
Lithium Ion Battery Module Cap. 0.4 KWH 595.2 Module per day Lithium Ion Battery Module Cap. 4.8 K
Plant and Machinery cost:
3600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
27.00%
Break Even Point (BEP):
41.00 %
TCI :
0.00 Lakhs
Cost of Project :
5000.00Lakhs
Add To Inquiry Basket
IV Cannula and Catheters Manufacturing Plant
IV Cannula and Catheters Manufacturing Plant

 

Although the name... Read More

Capacity :
IV Cannula with Wings & with Injection Port: 75,000 Pcs. per day Catheters: 18,750 Pcs. per day
Plant and Machinery cost:
1600.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
55.00 %
TCI :
0.00 Lakhs
Cost of Project :
2700.00Lakhs
Add To Inquiry Basket
Manufacturing Business of Surgical Sutures Assembling
Manufacturing Business of Surgical Sutures Assembling

Surgical sutures are used t... Read More

Capacity :
250 Boxes per day
Plant and Machinery cost:
82.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
26.00%
Break Even Point (BEP):
52.00 %
TCI :
0.00 Lakhs
Cost of Project :
313.00Lakhs
Add To Inquiry Basket
Lithium Ion Battery Pack Manufacturing Business A Profitable Business Opportunities for Entrepreneurs
Lithium Ion Battery Pack Manufacturing Business A Profitable Business Opportunities for Entrepreneurs

 

Lithium ion (Li-ion) ba... Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
Business Plan for PVC Edge Banding Tape Manufacturing Business
Business Plan for PVC Edge Banding Tape Manufacturing Business

Read More

Capacity :
0
Plant and Machinery cost:
0.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
0.00%
Break Even Point (BEP):
0.00 %
TCI :
0.00 Lakhs
Cost of Project :
0.00Lakhs
Add To Inquiry Basket
How to setup Plastic Waste Recycling Plant
How to setup Plastic Waste Recycling Plant

A Plastic Waste Recycling Plant (also known as a Pla... Read More

Capacity :
-
Plant and Machinery cost:
132.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
60.00 %
TCI :
0.00 Lakhs
Cost of Project :
401.00Lakhs
Add To Inquiry Basket
Business Plan for Setting up Automated Vehicle Scrapping and Recycling Unit
Business Plan for Setting up Automated Vehicle Scrapping and Recycling Unit

Vehicle recycling is the de... Read More

Capacity :
-
Plant and Machinery cost:
300.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
40.00 %
TCI :
0.00 Lakhs
Cost of Project :
2500.00Lakhs
Add To Inquiry Basket
Badminton Rackets Manufacturing Business
Badminton Rackets Manufacturing Business

Badminton rackets productio... Read More

Capacity :
1000 Pcs Per Day
Plant and Machinery cost:
81.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
64.00 %
TCI :
0.00 Lakhs
Cost of Project :
353.00Lakhs
Add To Inquiry Basket
Kids Wear Apparel T-Shirts & Bottom Wear Business Plan
Kids Wear Apparel T-Shirts & Bottom Wear Business Plan

Children's clothing may not... Read More

Capacity :
T-Shirts: 84 Pcs. per day | Bottom Wear: 84 Pcs. per day
Plant and Machinery cost:
43.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
28.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
68.00Lakhs
Add To Inquiry Basket
Start Traction Motors Permanent Magnet Synchronous Motors, Brushless DC Motors and Flux Motors Business
Start Traction Motors Permanent Magnet Synchronous Motors, Brushless DC Motors and Flux Motors Business

 

Start Traction Motors Permanent Magnet Synchronous Motors, Br... Read More

Capacity :
Permanent Magnet Synchronious Motors (5 KW, 48/72 Volt with 3000 RPM) 40 Nos. Per Day Brushless
Plant and Machinery cost:
114.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
30.00%
Break Even Point (BEP):
70.00 %
TCI :
0.00 Lakhs
Cost of Project :
510.00Lakhs
Add To Inquiry Basket
Dental Care Products GI Cement & Composite Lite Cure Business Plan
Dental Care Products GI Cement & Composite Lite Cure Business Plan

Consider starting a glass i... Read More

Capacity :
GI Cement (Part A Powder 5 gms each & Part B Liquid 5 ml each) 20000 Pcs. per Day | Compsite Lite Cu
Plant and Machinery cost:
39.00 Lakhs
Working Capital :
0.00
Rate of Return (ROR):
36.00%
Break Even Point (BEP):
74.00 %
TCI :
0.00 Lakhs
Cost of Project :
340.00Lakhs
Add To Inquiry Basket
NameCapacityRate of return (ROR):Cost of project
Be a Donkey Breeder Start... 0 0.00 0.00
Manufacturing Business Of... Wire Nails: 48,000 MT Per Annum 28.00 2600.00
A Business Plan for Alumi... Aluminium Alloy Ingots: 6,000 MT per Annum Aluminium Scrap: 99 MT per Annum 28.00 1100.00
Start Production of Cold ... Cold Pressed Rice Bran Oil (Edible Oil) : 270,000 Ltrs Per Annum 28.00 161.00
Setup Plant Of Super Abso... Super Absorbent Polymer: 30,000 MT Per Annum 30.00 4900.00
How to Setup Silicon Carb... 0 0.00 0.00
Start Production of Nicot... - 28.00 436.00
Start-up Production of MS... MS Barrels (Metal Barrels): 210,000 Units Per Annum, MS Scrap: 300 Units Per Annum 28.00 484.00
Start Industry Of Potato ... Potato Starch 30 MT Per Day 30.00 894.00
Manufacturing Business Of... - 29.00 150.00
Setup Own Business of Lat... 0 0.00 0.00
How to Start Your Own Gla... 0 0.00 0.00
A Business Plan for Sodiu... Sodium Chlorite (NaClO2) 15 MT Per Day 26.00 1892.00
A Business Plan for Highw... Metal Beam Highway Crash Barrier 167 MT per day MS Sheet Scrap 33 MT per day 30.00 2608.00
A Business Plan for Soda ... Soda Ash (Na2CO3) 200,000 MT Per Annum Ammonium Chloride (NH4Cl) 200,000 MT Per Annum 13.00 146900.00
Engineered Building Steel... PEB Structure 40 MT Per Day Steel Scrap waste Product 2 MT Per Day 25.00 5600.00
Start Lithium Oxide From ... Lithium Oxide 4 MT Per Day 30.00 2808.00
Start Maize Starch & Liqu... - 24.00 4300.00
Start Production Of Nicke... Nickel Cathod 4 MT Per Day 29.00 3030.00
Manufacturing Business Of... Biodegradable Boxes wt. 30 gms 15,160,000 Nos Per Annum 29.00 280.00
A Business Plan for Epoxy... Epoxy Resin Liquid 100 MT Per Day 30.00 4300.00
A Business Plan For Polyu... Polyurethane Prepolymer (HMDI Series) 50,000 MT Per Annum 29.00 4866.00
Start Industry of Activat... Activated Carbon 5 MT per day 26.00 743.00
Setup Unit Of Tea Blendin... - 28.00 242.00
Start Manufacturing Busin... Blood Bags 10,000 Nos per day 30.00 1092.00
Start Production of Decor... Decorative Laminated Sheet (Sunmica) 5,000,000 Sq.Mt. Per Annum 63.00 2257.00
Copper Tube Fittings Manu... Copper Tube Fittings 600 MT Per Annum Copper Scrap 24 MT Per Annum 28.00 675.00
Setup Pharmaceutical Tabl... - 27.00 786.00
Start Industry with Serum... 0 0.00 0.00
A Business Plan For Bottl... - 28.00 1975.00
12345678910...
« Back1 2 3 4 5Next »

Showing 1 - 60 of 615 Product(s)

Subject of your Interest

Information

  • One Lac / Lakh / Lakhs is equivalent to one hundred thousand (100,000)
  • One Crore is equivalent to ten million (10,000,000)
  • T.C.I is Total Capital Investment
  • We can modify the project capacity and project cost as per your requirement.
  • We can also prepare project report on any subject as per your requirement.
  • Caution: The project's cost, capacity and return are subject to change without any notice. Future projects may have different values of project cost, capacity or return.

NIIR PROJECT CONSULTANCY SERVICES (NPCS) is a reliable name in the industrial world for offering integrated technical consultancy services. NPCS is manned by engineers, planners, specialists, financial experts, economic analysts and design specialists with extensive experience in the related industries.

Our various services are: Detailed Project Report, Business Plan for Manufacturing Plant, Start-up Ideas, Business Ideas for Entrepreneurs, Start up Business Opportunities, entrepreneurship projects, Successful Business Plan, Industry Trends, Market Research, Manufacturing Process, Machinery, Raw Materials, project report, Cost and Revenue, Pre-feasibility study for Profitable Manufacturing Business, Project Identification, Project Feasibility and Market Study, Identification of Profitable Industrial Project Opportunities, Business Opportunities, Investment Opportunities for Most Profitable Business in India, Manufacturing Business Ideas, Preparation of Project Profile, Pre-Investment and Pre-Feasibility Study, Market Research Study, Preparation of Techno-Economic Feasibility Report, Identification and Section of Plant, Process, Equipment, General Guidance, Startup Help, Technical and Commercial Counseling for setting up new industrial project and Most Profitable Small Scale Business.

NPCS also publishes varies process technology, technical, reference, self employment and startup books, directory, business and industry database, bankable detailed project report, market research report on various industries, small scale industry and profit making business. Besides being used by manufacturers, industrialists and entrepreneurs, our publications are also used by professionals including project engineers, information services bureau, consultants and project consultancy firms as one of the input in their research.

Our Detailed Project report aims at providing all the critical data required by any entrepreneur vying to venture into Project. While expanding a current business or while venturing into new business, entrepreneurs are often faced with the dilemma of zeroing in on a suitable product/line.

And before diversifying/venturing into any product, wish to study the following aspects of the identified product:
  • Good Present/Future Demand
  • Export-Import Market Potential
  • Raw Material & Manpower Availability
  • Project Costs and Payback Period

We at NPCS, through our reliable expertise in the project consultancy and market research field, Provides exhaustive information about the project, which satisfies all the above mentioned requirements and has high growth potential in the markets. And through our report we aim to help you make sound and informed business decision.

Reasons for buying the report:
  • This report helps you to identify a profitable project for investing or diversifying into by throwing light to crucial areas like industry size, demand of the product and reasons for investing in the product.
  • This report provides vital information on the product like its definition, characteristics and segmentation.
  • This report helps you market and place the product correctly by identifying the target customer group of the product.
  • This report helps you understand the viability of the project by disclosing details like raw materials required, manufacturing process, project costs and snapshot of other project financials.
  • The report provides forecasts of key parameters which helps to anticipate the industry performance and make sound business decision.
The report contains all the data which will help an entrepreneur find answers to questions like:
  • Why I should invest in this project?
  • What will drive the growth of the product?
  • What are the costs involved?
  • What will be the market potential?

The report first focuses on enhancing the basic knowledge of the entrepreneur about the main product, by elucidating details like product definition, its uses and applications, industry segmentation as well as an overall overview of the industry sector in India. The report then helps an entrepreneur identify the target customer group of its product. It further helps in making sound investment decision by listing and then elaborating on factors that will contribute to the growth of product consumption in India and also talks about the foreign trade of the product along with the list of top importing and top exporting countries. Report includes graphical representation and forecasts of key data discussed in the above mentioned segment. It further explicates the growth potential of the product. The report includes other market data like key players in the Industry segment along with their contact information and recent developments. It includes crucial information like raw material requirements, list of machinery and manufacturing process for the plant. Core project financials like plant capacity, costs involved in setting up of project, working capital requirements, projected revenue and profit are further listed in the report.

  • Our research reports broadly cover Indian markets, present analysis, outlook and forecast.
  • The market forecasts are developed on the basis of secondary research and are cross-validated through interactions with the industry players.
  • We use reliable sources of information and databases. And information from such sources is processed by us and included in the report.

Our Market Survey cum Detailed Techno Economic Feasibility Report Contains following information:

Introduction
  • Project Introduction
  • Project Objective and Strategy
  • Concise History of the Product
  • Properties
  • BIS (Bureau of Indian Standards) Provision & Specification
  • Uses & Applications
Market Study and Assessment
  • Current Indian Market Scenario
  • Present Market Demand and Supply
  • Estimated Future Market Demand and Forecast
  • Statistics of Import & Export
  • Names & Addresses of Existing Units (Present Players)
  • Market Opportunity
Raw Material
  • List of Raw Materials
  • Properties of Raw Materials
  • Prescribed Quality of Raw Materials
  • List of Suppliers and Manufacturers
Personnel (Manpower) Requirements
  • Requirement of Staff & Labor (Skilled and Unskilled) Managerial, Technical, Office Staff and Marketing Personnel
Plant and Machinery
  • List of Plant & Machinery
  • Miscellaneous Items
  • Appliances & Equipments
  • Laboratory Equipments & Accessories
  • Electrification
  • Electric Load & Water
  • Maintenance Cost
  • Sources of Plant & Machinery (Suppliers and Manufacturers)
Manufacturing Process and Formulations
  • Detailed Process of Manufacture with Formulation
  • Packaging Required
  • Process Flow Sheet Diagram
Infrastructure and Utilities
  • Project Location
  • Requirement of Land Area
  • Rates of the Land
  • Built Up Area
  • Construction Schedule
  • Plant Layout and Requirement of Utilities
Assumptions for Profitability workings
Plant Economics
Production Schedule
Land & Building
  • Factory Land & Building
  • Site Development Expenses
Plant & Machinery
  • Indigenous Machineries
  • Other Machineries (Miscellaneous, Laboratory etc.)
Other Fixed Assets
  • Furniture & Fixtures
  • Pre-operative and Preliminary Expenses
  • Technical Knowhow
  • Provision of Contingencies
Working Capital Requirement Per Month
  • Raw Material
  • Packing Material
  • Lab & ETP Chemical Cost
  • Consumable Store
Overheads Required Per Month And Per Annum
  • Utilities & Overheads (Power, Water and Fuel Expenses etc.)
  • Royalty and Other Charges
  • Selling and Distribution Expenses
Salary and Wages
Turnover Per Annum
Share Capital
  • Equity Capital
  • Preference Share Capital
Annexure 1:: Cost of Project and Means of Finance
Annexure 2:: Profitability and Net Cash Accruals
  • Revenue/Income/Realisation
  • Expenses/Cost of Products/Services/Items
  • Gross Profit
  • Financial Charges
  • Total Cost of Sales
  • Net Profit After Taxes
  • Net Cash Accruals
Annexure 3 :: Assessment of Working Capital requirements
  • Current Assets
  • Gross Working. Capital
  • Current Liabilities
  • Net Working Capital
  • Working Note for Calculation of Work-in-process
Annexure 4 :: Sources and Disposition of Funds
Annexure 5 :: Projected Balance Sheets
  • ROI (Average of Fixed Assets)
  • RONW (Average of Share Capital)
  • ROI (Average of Total Assets)
Annexure 6 :: Profitability ratios
  • D.S.C.R
  • Earnings Per Share (EPS)
  • Debt Equity Ratio
Annexure 7 :: Break-Even Analysis
  • Variable Cost & Expenses
  • Semi-Var./Semi-Fixed Exp.
  • Profit Volume Ratio (PVR)
  • Fixed Expenses / Cost
  • B.E.P
Annexure 8 to 11:: Sensitivity Analysis-Price/Volume
  • Resultant N.P.B.T
  • Resultant D.S.C.R
  • Resultant PV Ratio
  • Resultant DER
  • Resultant ROI
  • Resultant BEP
Annexure 12 :: Shareholding Pattern and Stake Status
  • Equity Capital
  • Preference Share Capital
Annexure 13 :: Quantitative Details-Output/Sales/Stocks
  • Determined Capacity P.A of Products/Services
  • Achievable Efficiency/Yield % of Products/Services/Items
  • Net Usable Load/Capacity of Products/Services/Items
  • Expected Sales/ Revenue/ Income of Products/ Services/ Items
Annexure 14 :: Product wise domestic Sales Realisation
Annexure 15 :: Total Raw Material Cost
Annexure 16 :: Raw Material Cost per unit
Annexure 17 :: Total Lab & ETP Chemical Cost
Annexure 18 :: Consumables, Store etc.,
Annexure 19 :: Packing Material Cost
Annexure 20 :: Packing Material Cost Per Unit
Annexure 21 :: Employees Expenses
Annexure 22 :: Fuel Expenses
Annexure 23 :: Power/Electricity Expenses
Annexure 24 :: Royalty & Other Charges
Annexure 25 :: Repairs & Maintenance Exp.
Annexure 26 :: Other Mfg. Expenses
Annexure 27 :: Administration Expenses
Annexure 28 :: Selling Expenses
Annexure 29 :: Depreciation Charges – as per Books (Total)
Annexure 30 :: Depreciation Charges – as per Books (P & M)
Annexure 31 :: Depreciation Charges - As per IT Act WDV (Total)
Annexure 32 :: Depreciation Charges - As per IT Act WDV (P & M)
Annexure 33 :: Interest and Repayment - Term Loans
Annexure 34 :: Tax on Profits
Annexure 35 ::Projected Pay-Back Period And IRR